Staff Report
In December, Allen Construction began work on a new 6,121 square foot leadership center at Dunn School in Los Olivos. Once completed, the Cindy Bronfman Leadership Center will be a multi-purpose facility that serves as the hub of whole-student education and leadership at Dunn School.
The new center will feature flexible spaces for modern teaching and learning, an Innovation Lab for student collaboration, and a new college counseling center.
It also will include the Earwig Café, a student-run snack bar that teaches business and entrepreneurship; a large Alumni Hall for all-school meetings and presentations; a student loft for quiet study and retreat; a balcony with a view of the Santa Ynez Mountains; and shaded outdoor spaces for reflection and relaxation.
The building is designed on a “first principles” approach by taking full advantage of natural phenomena to achieve energy efficiency. The building will have three large wind chimneys to capture and funnel hot air out. Floors will be exposed concrete, which will help cool the building naturally during warmer months, and large bay doors can be opened to allow breezes to cool the building even further.
“We are excited to be part of this great project for Dunn School,” said Eric Johnson, Regional Director for Allen Construction. “The building’s design falls in line with our philosophy of green building and sustainability.”
The facility is expected to be completed by late 2019. For updates on the project, visit dunnschool.org.